I think that is unnecessary to wait for the flattening of the terrain, to place a building on the terrain after the flatten. I almost always forget to place the building in the flattened terrain right after.
Interesting idea. It definately should be included in the work just as cleaning the space before constructing.
Not to mention, I’ve flattened the same piece of terrain 5 times in a row and I still can’t place a building in the zone. Still getting the “slope too steep” message… very annoying. I would much rather the building take another 50% more labor and auto-flatten the area.
Yes to this!!! If it’s really steep the labor cost/time to clear can be really high. It’s especially frustrating to use the leveling command and……nothing levels anything
I also prefer this method. it could be also use as an option for those who doesnt want this feature.
One way to go about it could be to use stone to raise the side to level, this way would even look nice and be realistic
This topic was automatically closed 90 days after the last reply. New replies are no longer allowed.