Flatten terrain automatically when placing a building construction

I think that is unnecessary to wait for the flattening of the terrain, to place a building on the terrain after the flatten. I almost always forget to place the building in the flattened terrain right after.

6 Likes

Interesting idea. It definately should be included in the work just as cleaning the space before constructing.

2 Likes

Not to mention, I’ve flattened the same piece of terrain 5 times in a row and I still can’t place a building in the zone. Still getting the “slope too steep” message… very annoying. I would much rather the building take another 50% more labor and auto-flatten the area.

3 Likes

Yes to this!!! If it’s really steep the labor cost/time to clear can be really high. It’s especially frustrating to use the leveling command and……nothing levels anything

1 Like

I also prefer this method. it could be also use as an option for those who doesnt want this feature.

1 Like

One way to go about it could be to use stone to raise the side to level, this way would even look nice and be realistic

1 Like

This topic was automatically closed 90 days after the last reply. New replies are no longer allowed.